CONGRESS THEATRE
989
portfolio_page-template-default,single,single-portfolio_page,postid-989,bridge-core-3.1.0,,qode_grid_1300,qode-theme-ver-29.8,qode-theme-bridge,disabled_footer_top,qode_header_in_grid,wpb-js-composer js-comp-ver-7.0,vc_responsive
 

CONGRESS THEATRE

A brand new façade to closely match the original for this Grade II listed theatre.

 

PURPOSE OF THE WORK:

To replace the existing façade on a Grade II listed modernist building after the original structure had been damaged by sea air.

 

WHAT WE DELIVERED:

Using bespoke profiles in combination with the Schuco Jansen system, we designed, manufactured and installed a new façade to closely match the original.

 

BENEFITS:

The screen is now thermally broken and double glazed, improving the thermal performance of the entire façade, as well as enhancing the appearance of the building.

 

FULL CASE STUDY:

 

 

Read more in our Case Study on The Congress Theatre, Eastbourne.

The final appearance was always going to be of utmost importance to the success of the project. Structura’s frames, cladding and associated structural elements were of the highest standard and this ensured that the final product was exemplary in terms of aesthetics and environmental performance. Paul Quanstrom, Corporate Project Officer, Eastbourne Borough Council

PROJECT

Congress Theatre

ARCHITECT

Faithfull + Gould

CLIENT

Eastbourne Borough Council

LOCATION

Eastbourne, East Sussex

Category
Architectural Glazing, Bespoke Glazing, Case Studies, Curtain Walling, Listed Building Refurbishment, Paint Spraying, Structura Case Study, Structura UK, Structural Glazing