REMEDIAL WORKS / REPLACEMENT - ATRIA GLAZING
 
 

Contract Name

Main Contractor

Description

Gateway House, Basingstoke

Waring Contractors

Extensive remedial works to existing curtainwalling, roofglazing, windows, cladding and doors.

 
 

Contract Name

Client

Contractor

Description

BOC Windlesham

BOC

Structura UK Ltd

Extensive Remedial works to existing glazed domes and barrel vaults. Involving the replacement of 35% of the existing reflective double glazed units.
Structura acted as principal contractor whilst the building was in full occupation.

 
  Contract Name

Client

Project Manager

Description

Marco Polo House, London

TV Digital/QVC

Mace Ltd

Structura acting as the Principal Contractor supplied bespoke access gantries to enable remedial works to be carried out to the glazed atrium roofs whilst the building was in occupation. Included in the scope of works was the installation of an external Solar Reflective film and the replacement of failed and broken insulating glass units.

 
  Contract Name

Client

Administrator

Description

Hyatt Regency Hotel, Birmingham

The Hyatt Group of Hotels

Ove Arup Facade Engineering

Structura UK Limited replaced approximately 2,000m2 of glazing to the external facade and in addition to this replaced the entire rooflight over the restaurant.
The existing facade was reglazed using bespoke aluminium extrusions to match the existing, with new solar control double and single glass units.
The new roof was constructed from the Hueck KF60 Series 1.0 system, specifically tested for this project, incorporating solar control double glazed units.

 
  Contract Name

Client

Contractor

Architects

Description

Lancer Square London

Crown Estates

Taylor Woodrow

Bickerdike Allen and Partners

Replacement of failed roof glazing to a shopping complex in Kensington. Replacement glazing system was designed by Structura and tested at Taywood Engineering, to comply with the performance specification, prepared by Bickerdike Allen and Partners

 
  Contract Name

Client

Contractor

Description

Greenlanes Shopping Centre

Guardian Properties

G Loosemore and Sons

This project involved the complete replacement of 2,200 sq. metres of glass to existing glazed roof structures in an occupied shopping centre. The project involved the design of new pressed metalwork perimeter to replace existing leadwork and the repair of existing smoke and natural air ventilators.

 
  Contract Name

Representitive

Consultant

Description

Trinity Square Hounslow

DTZ Tie Leung

Cladtech Associates

Stuctura UK Kimited as a specialist sub-contractor were appointed to carry out extensive remedial works to prevent water ingression through the atria glazing and sloped glazing.
As part of the works we also provided replacement double glazed units, pressed metal panels and pressings